Empowering and bringing their inner beauty to life

Empowering and bringing their inner beauty to life

Lifetime Impact 44in Adjustable Portable Basketball System

Sweat Band
Reviews:
Rated 4.7 out of 5
PID:
4954857
EAN:
841101003022
MPN:
SBB-P-1268-DD

Our Lifetime Impact 44in Adjustable Portable Basketball System

Play basketball in the comfort of your own driveway with the Lifetime Impact 44in adjustable portable basketball system. Featuring an 18′ (46cm) classic rim and an all-weather net, the system is great for improving shooting skills, passing, dribbling, footwork, and ball control. It has a solid Streamline base that can be filled with sand or water (up to 73 litres) for extra stability and offers a sturdy backboard and a 3-piece pole system. A height adjustment range of 229-305cm (7.5-10ft) makes the Impact system suitable for users of different heights. Plus, it is perfect for practising jump shots, free throws and slam dunks and guarantees quick and easy assembly.

For More Info On: Lifetime Impact 44in Adjustable Portable Basketball System - Click Button Below

These products are supplied by Sweatband Fitness our affiliate partner.
All product prices are correct at the time of adding to the website, all prices include VAT. The star rating is for illustration reasons only.